0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Viaduc de Martigues
Beginning of works: 1969
Completion: 1972
Status: in use

Project Type

Function / usage: Motorway bridge / freeway bridge
Support conditions:
Structure: main bridge:
Rigid frame bridge with inclined legs
Material: main bridge:
Steel bridge
Structurae Plus/Pro - Subscribe Now!
approach viaducts:
Prestressed concrete bridge
Construction method: portal legs:
Rotation around a horizontal axis

Location

Location: , , ,
Crosses:
  • Caronte Canal
Part of:
Coordinates: 43° 24' 9" N    5° 2' 32" E
Show coordinates on a map

Technical Information

Dimensions

total length 875 m
main bridge
total length 300 m
span lengths 85 m - 130 m - 85 m
clearance 45 m
number of spans 3
deck width 30 m
deck depth 3.30 - 6 m

Materials

deck steel
piers reinforced concrete
deck of approach viaducts prestressed concrete
portal legs steel

Participants

Initial construction (1969-1972)
Construction
Steel construction
Strengthening
Owner
Client
Structural engineering
Checking engineering
General contractor
Reinforcing steel
Remote monitoring system

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20001434
  • Published on:
    26/04/2001
  • Last updated on:
    22/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine