General Information
Status: | in use |
---|
Project Type
Construction method: |
Precast girders with cast-in-situ slab |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Multiple T-section girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
current use: Pedestrian bridge (footbridge) intended use: Road bridge |
Location
Location: |
Loboc, Bohol, Philippines |
---|---|
Coordinates: | 9° 38' 10.34" N 124° 1' 48.94" E |
Technical Information
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20077844 - Published on:
21/07/2019 - Last updated on:
01/08/2019