0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 17 November 2014
Completion: 9 June 2016
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge

Location

Location: , ,
Crosses:
  • Don River
Coordinates: 57° 10' 34.53" N    2° 7' 6.12" W
Show coordinates on a map

Technical Information

Cost

cost of construction Pound sterling 22 000 000

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20071755
  • Published on:
    09/10/2016
  • Last updated on:
    12/09/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine