General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Pilsen, Plzen Region, Czechia |
---|---|
Address: | D 5 |
Crosses: |
|
Part of: | |
Connects to: |
Valik Tunnel (2006)
|
Coordinates: | 49° 40' 38.31" N 13° 19' 2.65" E |
Technical Information
Dimensions
total length | 574.81 m | |
span lengths | 31 m - 12 x 41 m - 31 m | |
number of spans | 14 | |
bridge surface | 16 729.3 m² | |
height above valley floor or water | 18.7 m | |
total width | 30.5 m |
Quantities
concrete volume | 17 994 m³ | |
prestressing steel | 350 t | |
reinforcing steel | 1 874.2 t |
Materials
deck |
prestressed concrete
|
---|
Participants
Client
Design
Structural engineering
Main contractor
Co-contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Autobahnbrücken in der Tschechischen Republik. In: DSI Info, n. 10 ( 2001- 2002), pp. 22.
- Highway bridges in the Czech Republic. In: DSI Info, n. 10 ( 2001- 2002), pp. 22.
- Pont d'autoroute en République Tchèque. In: DSI Info, n. 10 ( 2001- 2002), pp. 22.
- About this
data sheet - Structure-ID
20012853 - Published on:
09/08/2004 - Last updated on:
05/02/2016