0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bishenge (Masuma) Footbridge

General Information

Beginning of works: 17 April 2023
Completion: 7 July 2023
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Gasumo river.
Coordinates: 2° 21' 0" S    29° 25' 0" E
Show coordinates on a map

Technical Information

Dimensions

span 68 m

Materials

cables steel wire
pylon steel
deck steel

Notes

The bridge built by Bridges to Prosperity serves around 2818 people in the communities of Gishenge, Gakomeye, Kibuga and Ruhinga.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088227
  • Published on:
    11/04/2024
  • Last updated on:
    11/04/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine