General Information
Name in local language: | Viaducto del Azufre |
---|---|
Completion: | 1977 |
Status: | in use |
Project Type
Structure: |
Haunched girder bridge Box girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Ponferrada, León, Castile-Leon, Spain |
---|---|
Coordinates: | 42° 33' 49.60" N 6° 34' 53.74" W |
Technical Information
Dimensions
main span | 130 m | |
span lengths | 65.00 m - 130 m - 65.00 m | |
number of spans | 3 | |
deck | deck depth | 2.50 - 6.25 m |
deck width | 14.00 m | |
piers | dimensions at base | 3.00 m x 7.00 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Dos viaductos por avance en volazidos sucesivos. In: Hormigón y acero, v. 27, n. 119-120 (2nd Quarter 1976), pp. 289-294. (1976):
- Puentes por voladizos sucesivos. In: Hormigón y acero, v. 30, n. 130-132 (1st Quarter 1979), pp. 403-413. (1979):
- About this
data sheet - Structure-ID
20075435 - Published on:
14/06/2018 - Last updated on:
14/06/2018