0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Tres puentes construidos por el método de vanos sucesivos

Author(s):


Medium: journal article
Language(s): English, Spanish
Published in: Hormigón y acero, , n. 170, v. 40
Page(s): 79-82
Abstract:

Three bridges built with "in situ" sucessive spans construction method

This report presents three continuous road bridges built with prestressed concrete. The construction method was the "in site" sucessive span with partial prestresses. The maximum span in all of three bridges is over the 50 m and their total length is in the bigest of then up to 530 m. The transversal section is in all cases a unique box girder with a maximum total width of 14.0 m.

Available from: ACHE - Asociación Española de Ingeniería Estructural

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10076369
  • Published on:
    23/02/2019
  • Last updated on:
    23/02/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine