Production scheduling in modular construction: Metaheuristics and future directions
Author(s): |
Achini Peiris
Felix Kin Peng Hui Colin Duffield Tuan Ngo |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, June 2023, v. 150 |
Page(s): | 104851 |
DOI: | 10.1016/j.autcon.2023.104851 |
- About this
data sheet - Reference-ID
10727178 - Published on:
30/05/2023 - Last updated on:
30/05/2023