A New Risk Assessment Model for Construction Projects by Adopting a Best–Worst Method–Fuzzy Rule-Based System Coupled with a 3D Risk Matrix
Author(s): |
Hayder Razzaq Abed
Hatim A. Rashid |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Iranian Journal of Science and Technology, Transactions of Civil Engineering, December 2023, n. 1, v. 48 |
Page(s): | 541-559 |
DOI: | 10.1007/s40996-023-01105-x |
- About this
data sheet - Reference-ID
10726112 - Published on:
30/05/2023 - Last updated on:
10/02/2024