Minimizing Total Cost for Urban Freeway Reconstruction with Integrated Construction/Traffic Analysis
Author(s): |
Eul-Bum Lee
C. William Ibbs David Thomas |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Infrastructure Systems, December 2005, n. 4, v. 11 |
Page(s): | 250-257 |
DOI: | 10.1061/(asce)1076-0342(2005)11:4(250) |
- About this
data sheet - Reference-ID
10574612 - Published on:
27/02/2021 - Last updated on:
27/02/2021