0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Libyan Great Man-Made River Project Phase 1

Part 1: Manufacture of Prestressed Concrete Cylinder Pipe

Author(s):

Medium: journal article
Language(s): English
Published in: Proceedings of the Institution of Civil Engineers, , n. 4, v. 90
Page(s): 853-879
DOI: 10.1680/iicep.1991.15386
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1680/iicep.1991.15386.
  • About this
    data sheet
  • Reference-ID
    10264851
  • Published on:
    09/01/2019
  • Last updated on:
    09/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine