0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The interaction of BIM And FM through sport projects life cycle (case study: Sailia training site in Qatar)

Author(s):

Medium: journal article
Language(s): English
Published in: HBRC Journal, , n. 1, v. 18
Page(s): 31-51
DOI: 10.1080/16874048.2021.2018170
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/16874048.2021.2018170.
  • About this
    data sheet
  • Reference-ID
    10657628
  • Published on:
    17/02/2022
  • Last updated on:
    17/02/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine