Integrated optimization of stochastic resource scheduling and machine maintenance in prefabricated component production processes
Author(s): |
Jingjing Wang
Huimin Liu |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Automation in Construction, October 2023, v. 154 |
Page(s): | 105030 |
DOI: | 10.1016/j.autcon.2023.105030 |