0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Forecasting the Final Contract Cost on the Basis of the Owner’s Cost Estimation Using an Artificial Neural Network

This publication has been cited in the following 1 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10712790
  • Published on:
    21/03/2023
  • Last updated on:
    10/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine