Flughafen Sheremetyevo, Moskau - Planung und Fertigung der Stahldächer und Brücke
Author(s): |
O. Drawer
M. Fahlbusch M. Thiel |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Stahlbau, December 2010, n. 12, v. 79 |
Page(s): | 892-900 |
DOI: | 10.1002/stab.201001381 |
Abstract: |
Sheremetyevo Airport, Moscow, Russia - Structural design and fabrication of steel roofing and bridge.The new Terminal 3 was built as part of the significant expansion and modernization to increase passenger capacities at Sheremetyevo Airport in Moscow (Figure 1). Bollinger + Grohmann Ingenieure carried out the structural design for various canopies and a footbridge between parking garage and terminal building under the supervision of the Arnold AG. In the later stage of the project Müller Offenburg GmbH & Co. KG (MOG), Heinrich Lamparter Stahlbau GmbH & Co. KG (StaLA) and the Radabau GmbH were assigned the manufacturing contract. The following article deals with the peculiarities during the design stage and fabrication of individual structural elements of this particular project. |
Keywords: |
erection footbridge pedestrian bridge assembly four-chord truss substructure of the glass
|
Available from: | Refer to publisher |
Geographic Locations
- About this
data sheet - Reference-ID
10063922 - Published on:
22/12/2010 - Last updated on:
13/08/2014