0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Factors influencing the scope of private party’s obligations in concession-based PPP projects in Nigeria

Author(s):

Medium: journal article
Language(s): English
Published in: Structural Survey, , n. 3, v. 34
Page(s): 297-314
DOI: 10.1108/ss-01-2016-0003

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ss-01-2016-0003.
  • About this
    data sheet
  • Reference-ID
    10396876
  • Published on:
    05/12/2019
  • Last updated on:
    05/12/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine