0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Exploring the critical success determinants for supply chain management in modular integrated construction projects

Author(s): ORCID

Medium: journal article
Language(s): English
Published in: Smart and Sustainable Built Environment, , n. 2, v. 12
Page(s): 258-276
DOI: 10.1108/sasbe-03-2021-0051
Abstract:

Purpose

Modular integrated construction (MiC) projects are co-created by a network of organizations and players providing different roles, information and activities throughout the supply chains. Hence, a successful delivery of MiC projects can hardly be decoupled from effective supply chain management (SCM). This study investigated the critical success determinants of effective SCM in MiC projects.

Design/methodology/approach

Comprehensive literature research and expert review identified 20 candidate success determinants, which formed the basis for a structured questionnaire survey of experts in eighteen countries. The study computed the mean scores, normalized mean values and significance indices of success determinants for SCM in MiC projects.

Findings

The analysis revealed that design for SCM, effective communication and information sharing, organizational readiness and familiarity with MiC, seamless integration and coordination of supply chain, early involvement of critical supply chain stakeholders and extensive supply chain planning are the top five critical success determinants of effective SCM in MiC projects. The 20 success determinants are categorized into five: project strategy, bespoke competencies, process management, stakeholder management and risk management.

Research limitations/implications

The study has some limitations. The smaller sample size could affect the generalizability of the results. The generalized analysis of the success determinants overlooked their sensitivities to specific contexts, industry climates and project types.

Originality/value

The study established a novel set of critical success determinants for SCM in MiC projects that have not been explicitly discussed in the MiC success literature and described their hypothetical dynamic linkages. It contributes to a better understanding of how best to manage the MiC project supply chain effectively.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/sasbe-03-2021-0051.
  • About this
    data sheet
  • Reference-ID
    10779743
  • Published on:
    12/05/2024
  • Last updated on:
    12/05/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine