0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Der Boßlertunnel - optimiert im Bauprozess

The Boßler Tunnel - an optimised construction process

Author(s):
Medium: journal article
Language(s): English, German
Published in: DETAIL structure, , n. 2, v. 3
Page(s): 48-53

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10419736
  • Published on:
    12/04/2020
  • Last updated on:
    12/04/2020
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine