Assessment of a Concrete Cable-stayed Bridge after Replacement of Closure Segment
Author(s): |
Hongjiang Li
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Forensic Engineering, August 2019, n. 3, v. 172 |
Page(s): | 1-11 |
DOI: | 10.1680/jfoen.19.00024 |
Structure Types
- About this
data sheet - Reference-ID
10425759 - Published on:
22/06/2020 - Last updated on:
24/07/2020