0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Architektur mit Betonfertigteilen

All in! – Neubau des Multifunktionsgebäudes adidas HalfTime

Author(s): (Knippers Helbig GmbH Zehdenicker Straße 21 10119 Berlin)
(Knippers Helbig GmbH Tübinger Straße 12–16 70178 Stuttgart)
Medium: journal article
Language(s): German
Published in: Beton- und Stahlbetonbau, , n. 5, v. 116
Page(s): 396-404
DOI: 10.1002/best.202100022
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/best.202100022.
  • About this
    data sheet
  • Reference-ID
    10600592
  • Published on:
    17/04/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine