The accuracy of risk‐based cost estimation for water infrastructure projects: preliminary evidence from Australian projects
Author(s): |
Li Liu
Zigrid Napier |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Construction Management and Economics, January 2010, n. 1, v. 28 |
Page(s): | 89-100 |
DOI: | 10.1080/01446190903431525 |
- About this
data sheet - Reference-ID
10211379 - Published on:
05/12/2018 - Last updated on:
05/12/2018