0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

300 m in 19 Stunden - Modernisierung und Erweiterung der Produktionslinie eines Stahlbauunternehmens

Author(s):


Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 4, v. 73
Page(s): 276-280
DOI: 10.1002/stab.200490074
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.200490074.
  • About this
    data sheet
  • Reference-ID
    10061431
  • Published on:
    19/11/2010
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine