Author(s): |
David Arribas Mazarracín
Pablo Bernal Sahún José María Pérez Casas José Ignacio González Esteban |
---|---|
Medium: | conference paper |
Language(s): | Spanish |
Conference: | VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017 |
Year: | 2017 |
Abstract: | The Almonte Viaduct is one of the largest arches in the world. Given the scale involved, construction of this bridge necessitated more comprehensive engineering and detailing for some of its components. These tasks were performed by the builder's staff to ensure coordination as full as possible between the design and the construction teams, as described in this paper. |
Keywords: |
high-performance concrete self-compacting concrete
|