0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Cable Stressing Sequence of a Rock Anchored Cable Stayed Bridge

Author(s):
Medium: conference paper
Language(s): English
Conference: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014
Published in:
Year: 2014
Abstract:

This paper describes the cable stressing sequence for an asymmetrically rock anchored cable stayed pedestrian bridge at Tshelimnyama. The bridge crosses the N3 highway near Durban and was built for the South African National Roads Agency SOC Ltd (SANRAL). During the construction period various stressing sequences were analysed with the aim of limiting the erection engineering effort and the construction risks. The final solution was found after a number of iterations and used the structures’ self-weight to partially stress the most critical cables. Importantly this limited the forces on the temporary support cables and reduced the jacking forces needed to stress the permanent cables.

Keywords:
asymmetric temporary works cable-stayed erection engineering stressing sequence

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10070920
  • Published on:
    09/12/2014
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine