-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan / Ng, Thomas (2003): Targeting optimum value in public sector projects through "best value"‐focused contractor selection. In: Engineering, Construction and Architectural Management, v. 10, n. 6 (December 2003).
https://doi.org/10.1108/09699980310509390
-
Pham, Lam / Palaneeswaran, Ekambaram / Stewart, Rodney (2019): Role of Maintenance in Reducing Building Vulnerability to Extreme Events. Presented at: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019.
https://doi.org/10.2749/guimaraes.2019.1452
-
Palaneeswaran, Ekambaram / Ng, Thomas / Kumaraswamy, Mohan (2006): Client satisfaction and quality management systems in contractor organizations. In: Building and Environment, v. 41, n. 11 (November 2006).
https://doi.org/10.1016/j.buildenv.2005.06.004
-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan / Rahman, Motiar / Ng, Thomas (2003): Curing congenital construction industry disorders through relationally integrated supply chains. In: Building and Environment, v. 38, n. 4 (April 2003).
https://doi.org/10.1016/s0360-1323(02)00188-9
-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan (2001): Recent advances and proposed improvements in contractor prequalification methodologies. In: Building and Environment, v. 36, n. 1 (January 2001).
https://doi.org/10.1016/s0360-1323(99)00069-4
-
Palaneeswaran, Ekambaram / Love, Peter E. D. / Kumaraswamy, Mohan M. / Ng, Thomas S. T. (2008): Mapping rework causes and effects using artificial neural networks. In: Building Research & Information, v. 36, n. 5 ( 2008).
https://doi.org/10.1080/09613210802128269
-
Liu, Junxiao / Love, Peter E. D. / Smith, Jim / Regan, Michael / Palaneeswaran, Ekambaram (2015): Review of performance measurement: implications for public–private partnerships. In: Built Environment Project and Asset Management, v. 5, n. 1 (February 2015).
https://doi.org/10.1108/bepam-12-2013-0070
-
Kannimuthu, Marimuthu / Raphael, Benny / Palaneeswaran, Ekambaram / Kuppuswamy, Ananthanarayanan (2019): Optimizing time, cost and quality in multi-mode resource-constrained project scheduling. In: Built Environment Project and Asset Management, v. 9, n. 1 (March 2019).
https://doi.org/10.1108/bepam-04-2018-0075
-
Ng, Thomas / Palaneeswaran, Ekambaram / Kumaraswamy, Mohan (2008): Costs and Benefits of ISO9000-based Quality Management Systems to Construction Contractors. In: Australasian Journal of Construction Economics and Building, v. 8, n. 2 (November 2008).
https://doi.org/10.5130/ajceb.v8i2.3003
-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2005): Web-Based Client Advisory Decision Support System for Design–Builder Prequalification. In: Journal of Computing in Civil Engineering, v. 19, n. 1 (January 2005).
https://doi.org/10.1061/(asce)0887-3801(2005)19:1(69)
-
Thomas Ng, S. / Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2003): Web-based Centralized Multiclient Cooperative Contractor Registration System. In: Journal of Computing in Civil Engineering, v. 17, n. 1 (January 2003).
https://doi.org/10.1061/(asce)0887-3801(2003)17:1(28)
-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2000): Contractor Selection for Design/Build Projects. In: Journal of Construction Engineering and Management, v. 126, n. 5 (October 2000).
https://doi.org/10.1061/(asce)0733-9364(2000)126:5(331)
-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2008): An integrated decision support system for dealing with time extension entitlements. In: Automation in Construction, v. 17, n. 4 (May 2008).
https://doi.org/10.1016/j.autcon.2007.08.002
-
Chung, Jacky K. H. / Kumaraswamy, Mohan M. / Palaneeswaran, Ekambaram (2009): Improving megaproject briefing through enhanced collaboration with ICT. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.05.001
-
Lam, Ka Chi / Palaneeswaran, Ekambaram / Yu, Chen-yun (2009): A support vector machine model for contractor prequalification. In: Automation in Construction, v. 18, n. 3 (May 2009).
https://doi.org/10.1016/j.autcon.2008.09.007
-
Kumaraswamy, Mohan M. / Palaneeswaran, Ekambaram / Rahman, M. Motiar / Ugwu, Onuegbu O. / Ng, S. Thomas (2006): Synergising R&D initiatives for e-enhancing management support systems. In: Automation in Construction, v. 15, n. 6 (November 2006).
https://doi.org/10.1016/j.autcon.2005.10.001
-
Tam, Paul Wing Ming / Palaneeswaran, Ekambaram (1999): The use of enhanced positional weight method for constrained resources project scheduling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 2 (April 1999).
https://doi.org/10.1139/l98-052
-
Palaneeswaran, Ekambaram / Love, Peter E. D. / Kim, Jeong Tai (2014): Role of Design Audits in Reducing Errors and Rework: Lessons from Hong Kong. In: Journal of Performance of Constructed Facilities (ASCE), v. 28, n. 3 (June 2014).
https://doi.org/10.1061/(asce)cf.1943-5509.0000450
-
Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2003): Knowledge Mining of Information Sources for Research in Construction Management. In: Journal of Construction Engineering and Management, v. 129, n. 2 (March - April 2003).
https://doi.org/10.1061/(asce)0733-9364(2003)129:2(182)