0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Special Accommodation for Structural Steel Coating of Burlington Bay Skyway

 Special Accommodation for Structural Steel Coating of Burlington Bay Skyway
Autor(en): , , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 2771-2778
DOI: 10.2749/vancouver.2017.2771
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.23 MB

The northbound structure of Burlington Bay Skyway in Hamilton, Ontario recently underwent major rehabilitation. This included a component for the recoating of the structural steel in the 150 m-long...
Weiterlesen

Bibliografische Angaben

Autor(en): (Morrison Hershfield Limited, Toronto, ON, Canada)
(Morrison Hershfield Limited, Toronto, ON, Canada)
(Morrison Hershfield Limited, Toronto, ON, Canada)
(Ministry of Transportation of Ontario, Toronto, ON, Canada)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 2771-2778 Anzahl der Seiten (im PDF): 8
Seite(n): 2771-2778
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.2771
Abstrakt:

The northbound structure of Burlington Bay Skyway in Hamilton, Ontario recently underwent major rehabilitation. This included a component for the recoating of the structural steel in the 150 m-long overhead main span arch. The primary operational constraint was that traffic lanes stay open throughout construction. The additional gravity loads and wind loads from the scaffolding and environmental enclosures posed serious structural overload concerns. Extensive computer analysis and scenario testing enabled the development of a staging arrangement, structural strengthening scheme, high wind closure protocol integrated with rapid lane closure gates, and an overheight vehicle detection advanced warning system. This rehabilitation of the bridge commenced in Spring 2014 and was completed on time in Fall 2016 with no significant traffic delays or disruptions. Structural integrity was successfully maintained throughout construction.