-
Ebrahimy, Yasser / AbouRizk, Simaan M. / Fernando, Siri / Mohamed, Yasser (2011): Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. In: Engineering, Construction and Architectural Management, v. 18, n. 5 (September 2011).
https://doi.org/10.1108/09699981011074600
-
Ji, Wenying / Li, Yitong / AbouRizk, Simaan M. (2019): Integrated data-driven approach for analyzing pipe welding operator-quality performance. In: Automation in Construction, v. 106 (Oktober 2019).
https://doi.org/10.1016/j.autcon.2019.04.009
-
Ji, Wenying / AbouRizk, Simaan M. (2018): Simulation-Based Analytics for Quality Control Decision Support: Pipe Welding Case Study. In: Journal of Computing in Civil Engineering, v. 32, n. 3 (Mai 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000755
-
Zhang, Limao / Wu, Xianguo / Zhu, Hongping / AbouRizk, Simaan M. (2017): Performing Global Uncertainty and Sensitivity Analysis from Given Data in Tunnel Construction. In: Journal of Computing in Civil Engineering, v. 31, n. 6 (November 2017).
https://doi.org/10.1061/(asce)cp.1943-5487.0000714
-
Zhang, Limao / Wu, Xianguo / Ji, Wenying / AbouRizk, Simaan M. (2017): Intelligent Approach to Estimation of Tunnel-Induced Ground Settlement Using Wavelet Packet and Support Vector Machines. In: Journal of Computing in Civil Engineering, v. 31, n. 2 (März 2017).
https://doi.org/10.1061/(asce)cp.1943-5487.0000621
-
Song, Lingguang / AbouRizk, Simaan M. (2006): Virtual Shop Model for Experimental Planning of Steel Fabrication Projects. In: Journal of Computing in Civil Engineering, v. 20, n. 5 (September 2006).
https://doi.org/10.1061/(asce)0887-3801(2006)20:5(308)
-
Hajjar, Dany / AbouRizk, Simaan M. (2000): Integrating Document Management with Project and Company Data. In: Journal of Computing in Civil Engineering, v. 14, n. 1 (Januar 2000).
https://doi.org/10.1061/(asce)0887-3801(2000)14:1(70)
-
AbouRizk, Simaan M. / Halpin, Daniel W. (1990): Probabilistic Simulation Studies for Repetitive Construction Processes. In: Journal of Construction Engineering and Management, v. 116, n. 4 (Dezember 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:4(575)
-
AbouRizk, Simaan M. / Halpin, Daniel W. (1992): Statistical Properties of Construction Duration Data. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:3(525)
-
Hijazi, Adib M. / AbouRizk, Simaan M. / Halpin, Daniel W. (1992): Modeling and Simulating Learning Development in Construction. In: Journal of Construction Engineering and Management, v. 118, n. 4 (Dezember 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:4(685)
-
AbouRizk, Simaan M. / Halpin, Daniel W. / Wilson, James R. (1991): Visual Interactive Fitting of Beta Distributions. In: Journal of Construction Engineering and Management, v. 117, n. 4 (Dezember 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:4(589)
-
Hajjar, Dany / AbouRizk, Simaan M. (1998): Modeling and Analysis of Aggregate Production Operations. In: Journal of Construction Engineering and Management, v. 124, n. 5 (September 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:5(390)
-
Hajjar, Dany / AbouRizk, Simaan M. (2002): Unified Modeling Methodology for Construction Simulation. In: Journal of Construction Engineering and Management, v. 128, n. 2 (April 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:2(174)
-
AbouRizk, Simaan M. / Halpin, Daniel W. / Hill, Stephen L. (1991): Measuring Productivity and Validating Microcomputer Simulation. In: Computer-Aided Civil and Infrastructure Engineering, v. 6, n. 3 (Mai 1991).
https://doi.org/10.1111/j.1467-8667.1991.tb00404.x
-
Zhang, Limao / Liu, Mengjie / Wu, Xianguo / AbouRizk, Simaan M. (2016): Simulation-based route planning for pedestrian evacuation in metro stations: A case study. In: Automation in Construction, v. 71 (November 2016).
https://doi.org/10.1016/j.autcon.2016.08.031
-
Shi, Jingsheng / AbouRizk, Simaan M. (1997): Resource-Based Modeling for Construction Simulation. In: Journal of Construction Engineering and Management, v. 123, n. 1 (März 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:1(26)
-
Song, Lingguang / AbouRizk, Simaan M. (2005): Quantifying Engineering Project Scope for Productivity Modeling. In: Journal of Construction Engineering and Management, v. 131, n. 3 (März 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:3(360)
-
Sharma, Vishal / Al-Hussein, Mohamed / AbouRizk, Simaan M. (2006): Residential Construction Lot Grading Approval Process Optimization: Case Study of City of Edmonton. In: Journal of Construction Engineering and Management, v. 132, n. 12 (Dezember 2006).
https://doi.org/10.1061/(asce)0733-9364(2006)132:12(1225)
-
Song, Lingguang / AbouRizk, Simaan M. (2008): Measuring and Modeling Labor Productivity Using Historical Data. In: Journal of Construction Engineering and Management, v. 134, n. 10 (Oktober 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:10(786)
-
McCabe, Brenda / AbouRizk, Simaan M. (2001): Performance measurement indices for simulated construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 3 (Juni 2001).
https://doi.org/10.1139/l01-004
-
AbouRizk, Simaan M. / Sawhney, Anil (1993): Subjective and interactive duration estimation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 20, n. 3 (Juni 1993).
https://doi.org/10.1139/l93-060
-
Ruwanpura, Janaka Y. / AbouRizk, Simaan M. / Er, K. C. / Fernando, Siri (2001): Special purpose simulation templates for tunnel construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001).
https://doi.org/10.1139/cjce-28-2-222
-
Ruwanpura, Janaka Y. / AbouRizk, Simaan M. / Er, K. C. / Fernando, Siri (2001): Special purpose simulation templates for tunnel construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001).
https://doi.org/10.1139/l00-101
-
Song, Lingguang / Al-Battaineh, Hussien T. / AbouRizk, Simaan M. (2005): Modeling uncertainty with an integrated simulation system. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 3 (Juni 2005).
https://doi.org/10.1139/l05-004
-
Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, Simaan M. (2009): Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (September 2009).
https://doi.org/10.1139/l09-091
-
Wang, Ping / AbouRizk, Simaan M. (2009): Large-scale simulation modeling system for industrial construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (September 2009).
https://doi.org/10.1139/l09-094
-
Alvanchi, Amin / Azimi, Reza / Lee, SangHyun / AbouRizk, Simaan M. / Zubick, Paul (2012): Off-Site Construction Planning Using Discrete Event Simulation. In: Journal of Architectural Engineering (ASCE), v. 18, n. 2 (Juni 2012).
https://doi.org/10.1061/(asce)ae.1943-5568.0000055
-
Chehayeb, Nader N. / AbouRizk, Simaan M. (1998): Simulation-Based Scheduling with Continuous Activity Relationships. In: Journal of Construction Engineering and Management, v. 124, n. 2 (März 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:2(107)
-
AbouRizk, Simaan M. / Fayek, Aminah Robinson / Al-Hussein, Mohamed (2017): The University of Alberta's Hole School of Construction Engineering: 25 Years of Impact and Innovation. In: Journal of Construction Engineering and Management, v. 143, n. 9 (September 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001364
-
Zhang, Limao / Wu, Xianguo / Zhu, Hongping / AbouRizk, Simaan M. (2017): Perceiving safety risk of buildings adjacent to tunneling excavation: An information fusion approach. In: Automation in Construction, v. 73 (Januar 2017).
https://doi.org/10.1016/j.autcon.2016.09.003