General Information
Project Type
Structure: |
Shell |
---|
Location
Technical Information
Dimensions
height | 33.53 m | |
width of vaulting | 58.52 m |
Cost
cost of construction | United States dollar 65 000 000 |
Materials
arches |
steel
|
---|
Chronology
11 September 2001 | Heavily damaged during the collapse of the World Trade Center towers. |
---|---|
11 September 2001 | The roof structure and façade suffer partial collapse after the debris from the destruction of the World Trade Center hits the building. |
April 2002
— July 2002 |
Glass installation for the reconstruction is done. |
5 September 2002 | Reconstruction is completed. |
Participants
Architecture
-
Cesar Pelli & Associates, Inc.
- César Pelli (architect)
Structural engineering
Steel construction
Building services engineering
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Lightning Renewal Of Dazzling Atrium Lifts Lagging Spirits. Winter Garden team fulfills daring pledge to finish redo by Sept. 11. In: Engineering News Record (9 September 2002). (2002):
- Rebuilding the Winter Garden. In: Civil Engineering Magazine, v. 73, n. 1 (January 2003). (2003):
- About this
data sheet - Structure-ID
20004859 - Published on:
05/09/2002 - Last updated on:
29/07/2014