David Goodyear
-
Brand, Werner / Annan, Rachid / de Oliveira Almeida, Pedro Afonso / Bastien, Josée / Chandoga, Milan / Curran, Peter / Ciccone, Tommaso / Fischer, Gregor / Georgakis, Christos / Glaeser, Christian / Goodyear, David / Gutsch, Alex / Hosoi, Kiyotaka / Ikehata, Shinya / Kasuga, Akio / Tiger Kido, Toshiro / Kuilboer, Cor / Meiss, Kathy / Mellier, Erik / Neff, Theodore L. / Piekarski, Jan / Soule, Ben / Theryo, Teddy / Tejera Santos, Adrián / Weiher, Hermann / Wild, Matthias / Winkler, Jan / Zivanovic, Ivica / Mutsuyoshi, Hiroshi / Caballero, Antonio (2019): Acceptance of cable systems using prestressing steels. fédération internationale du béton (fib), Lausanne (Suisse), ISBN 9782883941304.
https://doi.org/10.35789/fib.BULL.0089
-
Goodyear, David (2011): Design of the New Mike O'Callaghan Pat Tillman Memorial Bridge at Hoover Dam. Présenté pendant: Structures Congress 2011, Las Vegas, Nevada, April 14-16, 2011, pp. 1806 - 1815.
https://doi.org/10.1061/41171(401)157
-
Smith, Monte J. / Goodyear, David (1988): A Practical Look at Creep and Shrinkage in Bridge Design. Dans: PCI Journal, v. 33, n. 3 (mai 1988), pp. 108-121.
https://doi.org/10.15554/pcij.05011988.108.121
-
Zanetell, Dave / Goodyear, David / St. John, Jeff / Lomax, Brian / Sullivan, Danny (2011): Engineering's Newest Marvel. Dans: Civil Engineering Magazine, v. 81, n. 10 (octobre 2011), pp. 56-87.
https://doi.org/10.1061/ciegag.0000373
-
Goodyear, David (2017): Design Basis for the New Port Mann Bridge over the Fraser River. Dans: Structural Engineering International, v. 27, n. 1 (février 2017), pp. 15-19.
https://doi.org/10.2749/101686617x14676303588832