Emmanuel Bouchon
-
Kretz, Thierry / Bois, Claude / Bouchon, Emmanuel / Dairaine, Xavier (2006): Rehabilitation and widening of the Aquitaine bridge. Présenté pendant: IABSE Conference: Operation, Maintenance and Rehabilitation of Large Infrastructure Projects, Bridges and Tunnels, Copenhagen, Denkmark, 15-17 May 2006, pp. 125-132.
https://doi.org/10.2749/222137806796236312
-
Bouchon, Emmanuel / Edon, Frédéric / Letey, Claude / Virlogeux, Michel (2001): The Beaucaire-Tarascon cable-stayed Bridge over the River Rhone. Présenté pendant: IABSE Conference: Cable-Supported Bridges - Challenging Technical Limits, Seoul, South Korea, 12-14 June 2001, pp. 57-64.
https://doi.org/10.2749/222137801796349556
-
Lecinq, Benoît / Bouchon, Emmanuel / Chaussin, Robert / Chabert, Alain (2001): French Recommendations for Stay Cables. Présenté pendant: IABSE Conference: Cable-Supported Bridges - Challenging Technical Limits, Seoul, South Korea, 12-14 June 2001, pp. 33-40.
https://doi.org/10.2749/222137801796350644
-
Asmar, Raja / Bouchon, Emmanuel / Buys, Jean-Pierre / Deschamps, Dominique / Kassis, Béchara / Salame, Antoine / Salha, Wadi / Vion, Philippe (2008): L'expertise et la réparation du pont en arc a Maameltein (Liban). Dans: Ouvrages d'art, n. 57 (mars 2008), pp. 2-13.
-
Bouchon, Emmanuel / Conti, Eric / Emateis, Daniel / Pero, Florence / Virlogeux, Michel / Damour, Régis / Abastado, Alexandre / Edon, Frédéric / Tasone, Marc / Demozay, Alain / Jacques, Pierre / Veyres, Frédéric / Lavigne, Charles (1994): Le pont de la rivière Saint-Denis à La Réunion (Océan indien). The bridge over the Saint-Denis River in Reunion (Indian Ocean). Présenté pendant: FIP Congres, Washington, 1994, pp. 491-497.