0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Extend the life of existing railway bridges – Results from EU FP7 project MAINLINE

 Extend the life of existing railway bridges – Results from EU FP7 project MAINLINE
Autor(en): , , , , ORCID
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 1219-1226
DOI: 10.2749/222137815818358493
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.09 MB

There is a need to extend the life and capacity of many existing bridges. One of the objects of the EU FP7 Project MAINLINE, 2011-2014, was to facilitate this. Guidelines for assessment and strengt...
Weiterlesen

Bibliografische Angaben

Autor(en): (Luleå University of Technology, Luleå, Sweden)
(Luleå University of Technology, Luleå, Sweden)
(Luleå University of Technology, Luleå, Sweden)
(Luleå University of Technology, Luleå, Sweden)
ORCID (Luleå University of Technology, Luleå, Sweden)
(Southeast University, Nanjing, PR China and Luleå University of Technology, Luleå, Sweden)
(Trafikverket, Luleå and Borlänge, Sweden)
(Trafikverket, Luleå and Borlänge, Sweden)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 1219-1226 Anzahl der Seiten (im PDF): 8
Seite(n): 1219-1226
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358493
Abstrakt:

There is a need to extend the life and capacity of many existing bridges. One of the objects of the EU FP7 Project MAINLINE, 2011-2014, was to facilitate this. Guidelines for assessment and strengthening methods are presented as well as case studies in which existing bridges are studied in order to extend their life length.

One example is the prestressing of the slab in a one-span concrete trough bridge in order to increase its load-carrying capacity. Horizontal holes were drilled trough the slab and in them steel bars were placed and post-tensioned. In this way a compressive stress was introduced into the concrete section so that it’s bending and shear capacity was increased.

In another study a metal truss bridge was monitored in order to check strain and stress ranges in critical connections to enable an enhanced evaluation of the remaining fatigue resistance. The studied bridge was then replaced and loaded to failure to study its robustness and the reliability of applied assessment methods. The results could then be applied to prolong the life of an identical twin bridge located in the northern part of Sweden.

A Life Cycle Assessment Tool (LCAT) has been developed to enable Infrastructure Managers to choose optimal maintenance strategies.

Stichwörter:
Tragwerksentwurf Brücken Modellbildung Lebenszyklusanalyse Richtlinien Verstärkung Reparatur Vorspannung Bewertungsmethoden

Bauwerkstypen