0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Transfer of Technology for Prestressed Concrete Bridges

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 3, v. 2
Seite(n): 199-201
DOI: 10.2749/101686692780628479
Abstrakt:

Myanmar engineers were first introduced to the technology of the construction of prestressed concrete girder bridges in 1967 when introduced to 30-m-span prestressed concrete girder bridges by Canadian engineers. The Bridge Engineering Training Center Project enabled Myanmar engineers to build the Thuwunna Bridge with a span of around 100 m, albeit under the guidance of the Japanese engineers stationed full-time at the site. The subsequent construction of Ngawun Bridge, with a similar span, provided the opportunity for Myanmar engineers to develop the technology acquired on the Thuwunna Bridge Project.

Bauwerkstypen

  • Über diese
    Datenseite
  • Reference-ID
    10003435
  • Veröffentlicht am:
    18.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine