0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Three Bridges with the Longest Spans for the New High-Speed Railway Lines

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 2, v. 2
Seite(n): 87-92
DOI: 10.2749/101686692780615860
Abstrakt:

The new high-speed railway line Hannover-Würzburg and its connection to the existing trunk line Würzburg-Aschaffenburg crosses the Valley of the Main River at Gemünden, Veitshöchheim and Nantenbach on bridges with a total length of 793.5 m, 1,280 m and 694.5 m, respectively. The approach spans of all three bridges correspond basically to the Rahmenplanung für Talbrücken (General Design for Viaducts). For the main bridges, special designs were required due to the large main spans of 135 m, 162 m and 208 m. These main spans are the longest of all bridges and viaducts built for the new high-speed railway lines in Germany. All bridges are double track railway bridges.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10003410
  • Veröffentlicht am:
    18.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine