0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 2, v. 2
Seite(n): 108-113
DOI: 10.2749/101686692780616030
Abstrakt:

Modern cable-stayed bridge construction involves the assembly of an almost unlimited variety of deck, pylon and cable elements together, in a multitude of different ways. For their static and dynamic analyses, the application of accurate and efficient mathematical models are essential. This paper presents various methods for modelling components of cable-stayed bridges, i.e., the cables, deck, pylon and joints, as well as the assembly of these components into a complete bridge model for general computer analysis. The use of appropriate finite elements for detailed analysis of deck units is also presented.

Bauwerkstypen

  • Über diese
    Datenseite
  • Reference-ID
    10003415
  • Veröffentlicht am:
    18.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine