Mike Tapley
- (2024): Developing computational design techniques to meet the increasing demand for more complex and sustainable bridges in Southeast Asia. Vorgetragen bei: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2022): Design and Construction of the West Kowloon Cultural District Artist Square Arch Footbridge. Vorgetragen bei: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022.
- (2022): Addressing Design and Construction Challenges for a Complex Elevated Interchange over the Sea. Vorgetragen bei: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022.
- (2021): Creating parametric design workflows for rapid conceptual design and optioneering. Vorgetragen bei: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
- (2021): Facing construction challenges in constructing two bridges to provide access to Singapore’s new waste facilities. Vorgetragen bei: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021.
- (2018): Construction and Engineering of the Iconic West Kowloon Station Roof in Hong Kong. Vorgetragen bei: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- (2015): The Macau Eiffel Tower - Recreating the 19th Century Elegance. Vorgetragen bei: IABSE Conference: Elegance in structures, Nara, Japan, 13-15 May 2015.