Addressing Design and Construction Challenges for a Complex Elevated Interchange over the Sea
|
Bibliografische Angaben
Autor(en): |
Mike Tapley
(Aurecon, Hong Kong)
Lemuel Leung (Aurecon, Hong Kong) Patrick Chan (Chun Wo Construction, Hong Kong) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022 | ||||
Veröffentlicht in: | IABSE Symposium Prague 2022 | ||||
|
|||||
Seite(n): | 1535-1542 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
DOI: | 10.2749/prague.2022.1535 | ||||
Abstrakt: |
As part of the strategic road network in Hong Kong, an express link will connect East Kowloon and the new town of Tseung Kwan O. Part of this link includes an elevated interchange over the sea with seven post- tensioned bridges. The series of balanced cantilever bridges within this marine interchange run in a spaghetti junction manner around the main line viaduct, which comprises two parallel bridges connected at each pier with a cast in-situ diaphragm. This paper presents the project’s unprecedented design challenges, along with the methods used to construct the complex viaducts whilst ensuring a safe construction environment. |
||||
Copyright: | © 2022 International Association for Bridge and Structural Engineering (IABSE) | ||||
Lizenz: | Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden. |