0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Design and Construction of the West Kowloon Cultural District Artist Square Arch Footbridge

 Design and Construction of the West Kowloon Cultural District Artist Square Arch Footbridge
Autor(en): , , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 944-953
DOI: 10.2749/nanjing.2022.0944
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

The West Kowloon Cultural District Artist Square Bridge (ASB) is a part of Hong Kong’s new art and cultural district development. It forms a primary pedestrian link between the adjacent MTR station...
Weiterlesen

Bibliografische Angaben

Autor(en): (Aurecon, Hong Kong)
(Aurecon, Hong Kong)
(Gammon Construction Ltd (Lambeth Associates))
(Gammon Construction Ltd (Lambeth Associates))
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 944-953 Anzahl der Seiten (im PDF): 10
Seite(n): 944-953
Anzahl der Seiten (im PDF): 10
DOI: 10.2749/nanjing.2022.0944
Abstrakt:

The West Kowloon Cultural District Artist Square Bridge (ASB) is a part of Hong Kong’s new art and cultural district development. It forms a primary pedestrian link between the adjacent MTR station and the new development. ASB is a design-and-build project consisting of a 78m clear spanning, 8m wide footbridge, an access lift tower and a 30m long staircase and escalators. The footbridge is a covered, dual steel arch and Vierendeel truss footbridge, that crosses an existing flyover, connecting the station shopping mall to the new development. During construction of ASB, very limited space was available on the new development site to accommodate the construction of ASB. These posed engineering challenges to the design and construction team. This paper presents the design of the ASB structures with particular focus on the main footbridge, and the challenges encountered during the design and construction of ASB and how incremental launching solution was developed to tackle these challenges.

Stichwörter:
Taktschiebeverfahren Modulare Konstruktion
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.

Bauwerke und Projekte