Nashwan Dawood
- Surrogate models for seismic and pushover response prediction of steel special moment resisting frames. In: Engineering Structures, v. 314 (September 2024). (2024):
- Verification and validation of a framework for collaborative BIM implementation, measurement and management (CIMM). In: Smart and Sustainable Built Environment, v. 12, n. 4 (August 2022). (2022):
- Maximising the construction waste reduction potential – how to overcome the barriers. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 176, n. 6 (1 November 2023). (2023):
- Integrated BIM and DfMA parametric and algorithmic design based collaboration for supporting client engagement within offsite construction. In: Automation in Construction, v. 133 (Januar 2022). (2022):
- A semantic common model for product data in the water industry. In: Journal of Information Technology in Construction, v. 26 (Januar 2021). (2021):
- Integrating IFC and NLP for automating change request validations. In: Journal of Information Technology in Construction, v. 24 (Februar 2019). (2019):
- On-demand monitoring of construction projects through a game-like hybrid application of BIM and machine learning. In: Automation in Construction, v. 110 (Februar 2020). (2020):
- (2019): Short-Term Prediction of Energy Consumption in Demand Response for Blocks of Buildings: DR-BoB Approach. In: Buildings, v. 9, n. 10 (25 September 2019).
- A Web3D Enabled Information Integration Framework for Facility Management. In: Australasian Journal of Construction Economics and Building - Conference Series, v. 2, n. 1 (Januar 2014). (2014):
- Innovative managerial control system (IMCS): an application in precast concrete building products industry. In: Construction Innovation, v. 6, n. 2 (Juni 2006). (2006):
- Simulation-based optimisation using simulated annealing for crew allocation in the precast industry. In: Architectural Engineering and Design Management, v. 14, n. 1-2 (Dezember 2017). (2017):
- Visualisation of a stockyard layout simulator "SimStock": a case study in precast concrete products industry. In: Automation in Construction, v. 12, n. 2 (März 2003). (2003):
- Intelligence approach to production planning system for bespoke precast concrete products. In: Automation in Construction, v. 15, n. 6 (November 2006). (2006):