Yi Sun-sin Bridge: Erection of Girder using Winch-Driven Lifting Gantry
|
Bibliografische Angaben
Autor(en): |
Bonggyo Jeong
Seungwook Jeong Youngsoo Shin |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Veröffentlicht in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Seite(n): | 296-301 | ||||
Anzahl der Seiten (im PDF): | 6 | ||||
DOI: | 10.2749/222137912805110457 | ||||
Abstrakt: |
The Yi Sun-sin Bridge connects the cities Yeosu and Gwangyang in Korea. The link provides easy access between Yeosu and the Gwangyang Industrial Complex. It is a suspension bridge with the main span of 1545m carrying four traffic lanes. This paper gives a description of the deck erection method adopted for this bridge. Emphasis has been put on the erection of a girder using a winch- driven lifting gantry. |
||||
Stichwörter: |
Hängebrücke
|