Temburong Bridge, Brunei
Feasibility Study
|
Bibliografische Angaben
Autor(en): |
Matthew Carter
(Arup, Hong Kong)
Sammy Yip (Arup, Hong Kong) Naeem Hussain (Arup, Hong Kong) Kok Kong Chin (Ove Arup Dan Rakan-Rakan, Brunei) Lee Sing Ding (Ove Arup Dan Rakan-Rakan, Brunei) Siew Long Lim (Ove Arup Dan Rakan-Rakan, Brunei) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015 | ||||
Veröffentlicht in: | IABSE Conference Geneva 2015 | ||||
|
|||||
Seite(n): | 1998-2005 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2015 | ||||
DOI: | 10.2749/222137815818359582 | ||||
Abstrakt: |
Temburong district has been physically isolated from the rest of Brunei which has hindered the economic growth of the district. A sea-crossing is planned to link the district to Brunei-Muara. A feasibility study was carried out between 2010 and 2012 to establish the alignment and preliminary design of the link, assess the project impacts and analyse the costs and benefits. |
||||
Stichwörter: |
Brücke Machbarkeitsstudie Meeresüberquerung
|