0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Temburong Bridge, Brunei – Ground Engineering - Part 2: Geotechnical Design

 Temburong Bridge, Brunei – Ground Engineering - Part 2: Geotechnical Design
Autor(en): , , , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 2022-2029
DOI: 10.2749/222137815818359528
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will provide a highway link between the two separated parts of Brunei, by spanning Brunei Bay. The complex geol...
Weiterlesen

Bibliografische Angaben

Autor(en): (Arup, Hong Kong)
(Arup, Hong Kong)
(Arup, Hong Kong)
(Arup, Hong Kong)
(Arup, Hong Kong)
(Arup, Hong Kong)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 2022-2029 Anzahl der Seiten (im PDF): 8
Seite(n): 2022-2029
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818359528
Abstrakt:

The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will provide a highway link between the two separated parts of Brunei, by spanning Brunei Bay. The complex geological setting brings particular challenges to the design and construction of the foundations required for the various forms of bridge structures. The varying depths of geological stratigraphy along the alignment and different loading conditions call for multiple deep foundation types, as well as different construction methodologies, to be adopted. Part 2 of this paper on the Ground Engineering aspects of the project focuses on the choices of foundation for different sections of the crossing, the geotechnical design approach and verification strategy, and the relevant computer analyses undertaken.

Stichwörter:
Eurocode Tiefgründung Zeitschrittanalyse Boden-Bauwerk-Interaktion

Bauwerke und Projekte