Temburong Bridge, Brunei – A new 30km road link
|
Bibliografische Angaben
Autor(en): |
Steve Kite
Kok On Yee Naeem Hussain Kok Kong Chin Sammy Yip Murphy To |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Veröffentlicht in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Seite(n): | 1971-1978 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2014 | ||||
DOI: | 10.2749/222137814814068625 | ||||
Abstrakt: |
The new 30km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. Improved connectivity will enhance the movement of labour, goods and services to and from Temburong, and will facilitate the development of eco-tourism in the area. The paper describes the objectives of the project, the project planning, the procurement strategy and the design for the various structures. Details are provided on the overall design criteria following Eurocodes, the seismic analysis, and the construction planning. |
||||
Stichwörter: |
Planung
|