0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Technical Research on OVM250 PSC System with High Fatigue Strength and Full Life Cycle Durability

 Technical Research on OVM250 PSC System with High Fatigue Strength and Full Life Cycle Durability
Autor(en): , , , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 1739-1747
DOI: 10.2749/nanjing.2022.1739
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

With the development of modern long-span cable-stayed bridges, due to the Parallel strand cable (PSC) being assembled on-site strand by strand, which has the advantages such as no need for large-sc...
Weiterlesen

Bibliografische Angaben

Autor(en): (Liuzhou OVM Machinery Co., Ltd.)
(Liuzhou OVM Machinery Co., Ltd.)
(Liuzhou OVM Machinery Co., Ltd.)
(Liuzhou OVM Machinery Co., Ltd.)
(Liuzhou OVM Machinery Co., Ltd.)
(Liuzhou OVM Machinery Co., Ltd.)
(Liuzhou OVM Machinery Co., Ltd.)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 1739-1747 Anzahl der Seiten (im PDF): 9
Seite(n): 1739-1747
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/nanjing.2022.1739
Abstrakt:

With the development of modern long-span cable-stayed bridges, due to the Parallel strand cable (PSC) being assembled on-site strand by strand, which has the advantages such as no need for large-scale equipment for cable-making, delivery, hoisting, traction, tensioning, and the corrosion protection of the cable is excellent, it is more and more favored by designers.

As the load-bearing components, the stay cables are known as the life cable of the cable- stayed bridge. Its reliability and durability are the key factors that determine the safety and the service life of the cable-stayed bridge. In accordance with the requirements specified in international recommendations, in-depth research has been carried out on cable fatigue, anti- corrosion, vibration control to optimize OVM250 PSC system. All research results have been successfully applied to cable stayed bridge projects.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.