0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Seismic retrofit for the truss bridges of the Seto-Ohashi Bridges

 Seismic retrofit for the truss bridges of the Seto-Ohashi Bridges
Autor(en): , , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1007-1014
DOI: 10.2749/stockholm.2016.0994
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.3 MB

In original seismic design of the Seto-Ohashi Bridges, an inland near-field earthquake was not considered. And there is concern that large-scale earthquakes would occur in the near future. Therefor...
Weiterlesen

Bibliografische Angaben

Autor(en): (Honshu-Shikoku Bridge Expressway Co., Ltd. Kobe, Hyogo, Japan)
(Honshu-Shikoku Bridge Expressway Co., Ltd. Kobe, Hyogo, Japan)
(Honshu-Shikoku Bridge Expressway Co., Ltd. Kobe, Hyogo, Japan)
(Honshu-Shikoku Bridge Expressway Co., Ltd. Kobe, Hyogo, Japan)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1007-1014 Anzahl der Seiten (im PDF): 8
Seite(n): 1007-1014
Anzahl der Seiten (im PDF): 8
Jahr: 2016
DOI: 10.2749/stockholm.2016.0994
Abstrakt:

In original seismic design of the Seto-Ohashi Bridges, an inland near-field earthquake was not considered. And there is concern that large-scale earthquakes would occur in the near future. Therefore seismic retrofit for truss bridges of the Seto-Ohashi Bridges has started. In the seismic retrofit design for the truss bridges, it was decided that seismic response of overall bridge was reduced firstly and the truss members were strengthened by additional stiffeners secondly. The stiffeners were attached to the truss members by bolting, because it was difficult to ensure quality of field welding. As inner surface of the closed box-section truss members has no coating, drilling bolt holes in the members was thought to increase the probability of corrosion of the members. Therefore it was decided to apply airtightness measures for the inside of the closed box-section members after their drying.

Stichwörter:
Korrosion Fachwerkbrücke Steife Erdbebennachbemessung

Bauwerke und Projekte