Repair of an Orthotropic Slab with UHPFRC Slab: Bridge at Illzach in France, Return from Experience after 5 years

 Repair of an Orthotropic Slab with UHPFRC Slab: Bridge at Illzach in France, Return from Experience after 5 years
Autor(en): , , , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S8-9
DOI: 10.2749/nantes.2018.s8-9
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.29 MB

Built in 1970, the Illzach Bridge located near Mulhouse in the East of France is a single 106 m span carrying a two traffic lanes with two lateral steel trusses and an orthotropic slab with transve...
Weiterlesen

Bibliografische Angaben

Autor(en): (Cerema, Sourdun, France)
(Cerema, Metz, France)
(Cerema, Strasbourg, France)
(Département du Haut-Rhin, Colmar, France)
(Eiffage, Vélizy-Villacoublay, France)
(Eiffage, Corbas, France)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S8-9 Anzahl der Seiten (im PDF): 7
Seite(n): S8-9
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/nantes.2018.s8-9
Abstrakt:

Built in 1970, the Illzach Bridge located near Mulhouse in the East of France is a single 106 m span carrying a two traffic lanes with two lateral steel trusses and an orthotropic slab with transverse cross beams. After the detection in 2009 of numerous cracks in the deck welds, a repair solution, based on the replacement of the asphalt layer by a UHPFRC (Ultra High Performances Fibre reinforced Concrete) slab, with local connection to the orthotropic slab, was adopted. The reparation process called Orthodalle® was designed thanks to results of a research national project of 4 years called Orthoplus (2007-2011) and the works took place during summer 2011.

After introducing the bridge and its disorders, this paper presents the design and the works of this innovative repair solution. In the following parts, the paper describes the numerous monitoring and testing operations during the 5 years after the repair, calculations made for the bridge and gives the conclusions of this project.

Stichwörter:
Monitoring UHPFRC