Quisi Bridge: a new route for the railway line in Alicante, Spain.

 Quisi Bridge: a new route for the railway line in Alicante, Spain.
Autor(en): , , , ,
Beitrag für IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, veröffentlicht in , S. 1278-1284
DOI: 10.2749/prague.2022.1278
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

The new bridge on the ravine of Quisi is located downstream of the existing Santa Ana bridge dated on the beginning of the XX century (1915). This steel truss structure has recently been refurbishe...
Weiterlesen

Bibliografische Angaben

Autor(en): (Degree of Freedom SLU, Valencia, Spain)
(Degree of Freedom SLU, Valencia, Spain)
(Degree of Freedom SLU, Valencia, Spain)
(Ferrocarrils de la Generalitat Valenciana, Valencia, Spain)
(UNIVERSITAT POLITÈCNICA DE VALENCIA, Valencia, Spain)
(Universitat Politècnica de València, Valencia, Spain)
(A-Ingenia Research & Consulting, Alicante, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Veröffentlicht in:
Seite(n): 1278-1284 Anzahl der Seiten (im PDF): 7
Seite(n): 1278-1284
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/prague.2022.1278
Abstrakt:

The new bridge on the ravine of Quisi is located downstream of the existing Santa Ana bridge dated on the beginning of the XX century (1915). This steel truss structure has recently been refurbished and stands out because of its historical, patrimonial, architectural and sentimental value. It will be used as a greenway, while the Quisi bridge will carry the new vehicles of the railway line. In this context, on top of the technical and budget constraints, the design team is aware of the importance of finding a correlation of the structures to enhance both civil constructions, that are to be found necessarily close one to each other. Finally, the solution for the new bridge consists of a 370 metres long post-tensioned concrete box girder divided into eight spans (35+6x50+35) and 8 metres wide, with a single fixed point to longitudinal actions located at the third pier with a distinctive A-shape.

Stichwörter:
Stahl Viadukt Beton FEM Instandsetzung Eisenbahn
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.

Geografische Orte