0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Optimization Process of Railway Segmental Bridges Constructed by Balanced Cantilever Method

 Optimization Process of Railway Segmental Bridges Constructed by Balanced Cantilever Method
Autor(en): ,
Beitrag für IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, veröffentlicht in , S. 1303-1309
DOI: 10.2749/manchester.2024.1303
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.22 MB

This paper highlights the challenges faced in large urban bridge infrastructure projects, including excessive material consumption and negative environmental impact. It focuses on the optimization ...
Weiterlesen

Bibliografische Angaben

Autor(en): (COWI, Prague, Czechia)
(COWI, Prague, Czechia)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Veröffentlicht in:
Seite(n): 1303-1309 Anzahl der Seiten (im PDF): 7
Seite(n): 1303-1309
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/manchester.2024.1303
Abstrakt:

This paper highlights the challenges faced in large urban bridge infrastructure projects, including excessive material consumption and negative environmental impact. It focuses on the optimization process conducted for a new pair of railway double-track bridges in Tel-Aviv, Israel, featuring continuous prestressed concrete box girders. The design works began in late 2020, with construction currently underway. COWI was responsible for the superstructure design packages, optimizing the box section, resulting in increased post-tensioning design efficiency and a 30% reduction in materials. Through careful planning and teamwork with the contractor, the project achieved lower carbon footprint, decreased cost, and increased speed of mobilization.

Stichwörter:
Brücke Hohlkasten Eisenbahn