Optimization of prestressing operations in the design of cable-stayed bridges by applying the Direct Algorithm

 Optimization of prestressing operations in the design of cable-stayed bridges by applying the Direct Algorithm
Autor(en): , , ,
Beitrag für IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, veröffentlicht in , S. 921-928
DOI: 10.2749/sanjose.2024.0921
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.56 MB

A new direct simulation of the cantilever erection method is presented in order to reduce the prestressing operations of stay cables. This new method introduces a direct approach for cable- stayed ...
Weiterlesen

Bibliografische Angaben

Autor(en): (MOST Enginyers, Barcelona, Spain)
(Tongji University, Shanghai, China)
(Universidad de Castilla-La Mancha, Ciudad Real, Spain)
(Universitat Politècnica de Catalunya, Barcelona, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024
Veröffentlicht in:
Seite(n): 921-928 Anzahl der Seiten (im PDF): 8
Seite(n): 921-928
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/sanjose.2024.0921
Abstrakt:

A new direct simulation of the cantilever erection method is presented in order to reduce the prestressing operations of stay cables. This new method introduces a direct approach for cable- stayed bridge construction using the cantilever erection method, employing independent finite element models. Prestressing forces are modeled as imposed strains based on the unstressed length concept to ensure the achievement of a specific target state post-construction (objective service stage, OSS). This facilitates faster simulation of the construction process, particularly for steel bridges and the predesign of concrete cable-stayed bridges, and enables direct simulation of construction stages and OSS achievement. The proposed method's efficacy is demonstrated through the analysis of a cable-stayed bridge.