0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Numerical Study on 1200m-span Railway Cable-stayed Bridges with Four Different Girder Sections

 Numerical Study on 1200m-span Railway Cable-stayed Bridges with Four Different Girder Sections
Autor(en): , , , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 801-808
DOI: 10.2749/vancouver.2017.0801
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.27 MB

The longest railway cable-stayed bridge, Hutong Bridge, with a 1092m main span, is going to be finished construction in 2019. It is no doubt that a railway cable-stayed bridge with main span over 1...
Weiterlesen

Bibliografische Angaben

Autor(en): (Central South University, Changsha, Hunan, China)
(Central South University, Changsha, Hunan, China)
(Central South University, Changsha, Hunan, China)
(Central South University, Changsha, Hunan, China)
(Central South University, Changsha, Hunan, China)
(Central South University, Changsha, Hunan, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 801-808 Anzahl der Seiten (im PDF): 8
Seite(n): 801-808
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.0801
Abstrakt:

The longest railway cable-stayed bridge, Hutong Bridge, with a 1092m main span, is going to be finished construction in 2019. It is no doubt that a railway cable-stayed bridge with main span over 1200m will come into being in the near future. This paper, basing on the design method of Hutong Bridge, extends a numerical study on cable-stayed bridges with 1204m main span. The numerical models adopt four different girder sections which are truss girder, orthotropic truss girder, box truss girder and box girder, aiming to find out the most suitable girder for the bridge. The advantages and disadvantages of these four kinds of sections will be valued by the effects on the pylons and piers, the stiffness of the girders, the effects on the railway and manufacturing cost. In conclusion, the mechanical characters of the box truss girder is better than other three sections and the cost of it ranks the third among these sections.

Stichwörter:
Fachwerkbinder numerische Analyse

Bauwerkstypen