Non-conventional Cable System in Multi-span Cable-stayed Bridges

 Non-conventional Cable System in Multi-span Cable-stayed Bridges
Autor(en): , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S5-157
DOI: 10.2749/nantes.2018.s5-157
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.29 MB

The design of multi-span cable-stayed bridges requires the control of horizontal displacements on the towers head when unbalanced loads are applied on deck. There are several strategies to reduce t...
Weiterlesen

Bibliografische Angaben

Autor(en): (Structural Mechanics Group, School of Civil Engineering, Universidade da Coruña, A Coruña, Spain)
(Structural Mechanics Group, School of Civil Engineering, Universidade da Coruña, A Coruña, Spain)
(Structural Mechanics Group, School of Civil Engineering, Universidade da Coruña, A Coruña, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S5-157 Anzahl der Seiten (im PDF): 8
Seite(n): S5-157
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/nantes.2018.s5-157
Abstrakt:

The design of multi-span cable-stayed bridges requires the control of horizontal displacements on the towers head when unbalanced loads are applied on deck. There are several strategies to reduce these displacements, being one of them the use of crossing stay cables in a central section of each main span. Based on this bridge typology, a general methodology to obtain the optimum cable system has been developed. Number of cables, anchor position of cables on the deck, cable areas and presstressing forces are considered design variables simultaneously into the optimization process. Each cable anchor position is associated to an independent design variable, allowing overlapping stay cables, different spacing of cables along the deck as well as different number of cables on each side of the same tower. Queensferry Crossing has been chosen as application example where the final design achieves an important saving in cable steel.

Stichwörter:
Schrägseilbrücke

Bauwerkstypen